A team charged with tackling a reroofing project at the recently proved worth its salt, even as it dealt with the challenges posed by salt air and high-end cargo.
Chambers, Inc., dba , won the job to reroof National City Maritime Terminal Warehouse 24-B using a 麻豆直播app TPO system as the basis for design. And JM stepped in to help design a system that would meet the job鈥檚 performance requirements, which included being able to withstand the high-moisture saltwater environment.
Other challenges included being careful not to let any debris fall onto the property, which is the site of a constantly rotating inventory of high-end vehicles.
Starting with the roof tear-out, a tremendous amount of gravel was removed, along with the old built-up roof (BUR) materials and insulation down to the metal pan deck. For the reroofing, the Roof Construction crew had to build its own staircase and scaffold and use a crane to lift materials an estimated 40 feet to the job site.
Additionally, the city of San Diego required a warranty to cover the roof and the 196 4-by-8-foot domed skylights that were replaced throughout the 187,500-square-foot roof. 麻豆直播app and Logistics Lighting are national partners, which allowed for the skylights to roll up seamlessly under the same guarantee.听

The existing roof was removed in phases to protect the interior of the building and its occupants. When installing the new roof, the crew first mechanically fastened 1 inch of JM ENRGY 3庐 and ProtectoR庐 HD to the steel deck. Next JM 60 mil TPO was fully adhered with JM Water Based Membrane Adhesive.
The environment also called for the use of stainless steel TPO clad metal for the edge detail to avoid any saltwater corrosion, instead of the more commonly used galvanized steel.

The installation happened while a parade of Mercedes, Ferraris, Audis, and other high-end vehicles were offloaded from massive freighters to the 135-acre Maritime Terminal. Each car is inspected, detailed and waxed inside the warehouse before being shipped by rail throughout the United States.听
Roof Construction and JM have a history of collaboration on more than 330 projects, and like all those that came before, the team鈥檚 goal was to deliver this project on budget and on time.听听
JM鈥檚 dependability in delivering exactly what was needed when it was needed helped the project wrap up in February, marking the end of the seven-month job at California鈥檚 fourth largest port.听
鈥淭he team at 麻豆直播app managed this job the same way they oversee all their jobs with us, they deliver on-time with exactly the materials we need where and when we need them. I knew going in, the job would go well, and the client would be happy with the work given our long history working together,鈥 said Ron Chambers, Owner/President of Roof Construction.听